Clients & Projects

Amscot Financial

8291 Dani Dr. Suite 110, Fort Myers, FL 33966

Interior Demolition

1850 SF Interior Remodel of Existing Space

This project involved the removal of walls and partitions, the dismantling of ACT ceilings along with grids and hangers, the removal of carpet and VCT flooring, and the removal of all millwork. 

Project Duration: 5 days

Testimonial

 It doesn’t get much better then Suncoast Wrecking. Mike and Paul were a pleasure to work with. These guys are extremely professional and dedicated to their craft. I look forward to working alongside them in the future.


Miguel Gonzalez • Superintendent

Barnes and Noble

4149 Tamiami Trail N, Naples, FL 34103

Interior Demolition

36,000 SF Interior Remodel of Existing Space

This project involved the removal of walls and partitions, the dismantling of ACT ceilings along with grid and hangers, the removal of double layer of VCT flooring, removal of restrooms, and column wraps

Project Duration: 10 days

Starbucks

7350 US Hwy 19, Pinellas Park, FL 33781

Selective Demolition

1600 SF Interior Remodel of Existing Starbuck

This project involved selective demolition of certain walls and partitions to be removed. All food equipment was moved into storage containers. Removal of all countertops and millwork. Removal of ACT ceilings, grids and hangers. Removal of ceramic tile flooring. Sawcut floor slab for E/P trenches.

Project Duration: 5 days

Planet Fitness

3725 Tamiami Trail E, Naples, FL 34112

Interior Demolition

22,000 SF Interior Remodel of Existing Space

This project involved the removal of walls and partitions, the dismantling of ACT ceilings along with the grid and hangers. Removal of all HVAC duct systems. Removal of mezzanine floor, including concrete slab, Q decking, bar joists and steel I-beams. Removal of interior CMU walls. Sawcut floor slab for E/P trenches. Exterior canopy removal including steel I-Beams.

Project Duration: 30 days

Hillsborough County Sheriffs Office DNA Crime Lab

1220 Tech Blvd, Tampa, FL 33619

Interior Demolition

10,000 SF Interior Remodel of Existing Space

This project involved the removal of walls and partitions, carpet, VCT tile, the dismantling of ACT ceilings along with the grid and hangers. Removal of interior CMU walls. Sawcut floor slab for E/P trenches. 

Project Duration: 5 days

O'Reilly Auto Parts

5574 Cortez Rd W, Bradenton, FL 34210

Interior Demolition

21,500 SF Interior Remodel of Existing Space

This project involved the removal of walls and partitions, carpet, VCT tile, cork flooring, ACT ceilings along with the grid and hangers. Removal of 2 interior CMU block walls for door openings. Sawcut floor slab for E/P trenches. 

Project Duration: 15 days

International Plaza and Bay Street Mall - Foot Locker

2223 N Westshore Blvd, Tampa, FL 33607

Interior Demolition

10,000 SF Interior Remodel of 3 Existing Spaces Into 1

This project involved the removal of walls and partitions, carpet, VCT tile, ceramic tile, hardwood flooring, ACT ceilings along with the grid and hangers. HVAC ducts. Storefront removal including glass and security gates. 

Project Duration: 14 days

Winn-Dixie Supermarket

100026 Coconut Rd, Bonita Springs, FL 34135

Complete Structural Demolition

45,000 SF Full Tear Down

This project involved the full dismantling of an old supermarket. This building is part of a connected strip mall which was properly dismantled at adjoining wall. Scaffolding protection provided over neighboring roof. Drained all refrigerants from rooftop AC units. Removed structure steel, concrete slab and footings.

Project Duration: 45 days

Ulta Beauty

10500 Ulmerton Rd, Largo, FL 33771

Interior Demolition

10,000 SF Interior Remodel of 3 Existing Spaces Into 1

This project involved the removal of walls and partitions, carpet, VCT tile, ceramic tile, ACT ceilings along with the grid and hangers. HVAC ducts. 

Project Duration: 8 days

Copyright © 2025 Suncoast Wrecking & Asset Recovery, LLC - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept