8291 Dani Dr. Suite 110, Fort Myers, FL 33966
1850 SF Interior Remodel of Existing Space
This project involved the removal of walls and partitions, the dismantling of ACT ceilings along with grids and hangers, the removal of carpet and VCT flooring, and the removal of all millwork.
Project Duration: 5 days
It doesn’t get much better then Suncoast Wrecking. Mike and Paul were a pleasure to work with. These guys are extremely professional and dedicated to their craft. I look forward to working alongside them in the future.
Miguel Gonzalez • Superintendent
4149 Tamiami Trail N, Naples, FL 34103
36,000 SF Interior Remodel of Existing Space
This project involved the removal of walls and partitions, the dismantling of ACT ceilings along with grid and hangers, the removal of double layer of VCT flooring, removal of restrooms, and column wraps
Project Duration: 10 days
7350 US Hwy 19, Pinellas Park, FL 33781
1600 SF Interior Remodel of Existing Starbuck
This project involved selective demolition of certain walls and partitions to be removed. All food equipment was moved into storage containers. Removal of all countertops and millwork. Removal of ACT ceilings, grids and hangers. Removal of ceramic tile flooring. Sawcut floor slab for E/P trenches.
Project Duration: 5 days
3725 Tamiami Trail E, Naples, FL 34112
22,000 SF Interior Remodel of Existing Space
This project involved the removal of walls and partitions, the dismantling of ACT ceilings along with the grid and hangers. Removal of all HVAC duct systems. Removal of mezzanine floor, including concrete slab, Q decking, bar joists and steel I-beams. Removal of interior CMU walls. Sawcut floor slab for E/P trenches. Exterior canopy removal including steel I-Beams.
Project Duration: 30 days